#Build construction back-office
7 field notes touching Build construction back-office. Sorted newest first.
Construction Back-Office: The Complete 2026 Guide for Mid-Market Contractors
The definitive 2026 guide to mid-market construction back-office: cost codes, change orders, job cost accounting, software selection (Procore, Autodesk, Sage, Foundation), project controls, and AI readiness.
Clean Job Data Before the AI Pilot: The Data Hygiene Field Guide for Mid-Market Contractors
A construction AI pilot reads whatever the firm's data gives it, and data fragmented across spreadsheets, email, scheduling tools, ERP, and field apps is where pilots stall. This guide sets out the data hygiene baseline mid-market contractors need to establish before the next AI pilot starts.
Change Order Management: The Documentation Gap That Produces Construction Disputes
Change order management is the documentation discipline that determines whether a construction firm gets paid for changes. The lifecycle, the AIA documents, and the two failure patterns that produce disputes.
ASC 606 for Construction: Percentage-of-Completion in the New World, and What the Auditor Will Test
ASC 606 changed how construction contracts are accounted for, but the more consequential change is the documentation the auditor now expects. The application that survives audit, contract by contract.
Procore vs Sage 300 CRE vs Foundation: How to Choose Mid-Market Construction Software
Construction software selection breaks across three categories, project management, financial-accounting plus job-cost, and integrated suites. The selection that lasts is not the one that demoed best; it is the one whose mid-implementation pain points the firm can absorb.
Job Cost Discipline: The Project-Level Controls That Scale Construction Past Twenty Million in Annual Volume
Job cost discipline is the project-level control set that lets a construction firm scale. The threshold where the wheels fall off, the cost-code structure that survives, and the controls that hold past the threshold.
WIP Schedules in Construction: The Report the Bonding Agent Actually Reads
The WIP schedule a bonding agent reads is structured, gross-margin-stable, and reveals fade. A common pattern in construction firms whose bonding capacity has stalled is that the WIP is the cause, not the symptom.