How to use this checklist
This is the working artifact paired with SOC 2 Type II for Digital Health: A First-Time Customer Field Guide. It runs eight to twelve weeks before the observation window opens, early enough that scoping, control design, and evidence wiring can still be changed, late enough that the auditor is selected and the engagement letter is signed. Two people run it: the internal compliance lead (control owners, evidence custody, exception management) and an outside readiness partner, the Securem partner where we are engaged (scoping memo, auditor interface, dry-run discipline).
Pass criteria are written so a "yes" is defensible inside fieldwork, the auditor's request will be answered by the same artifact the criterion describes. "Common failure" is the shape the finding usually takes on first-time digital health Type II reports. This checklist does not replace the auditor's testing; the auditor draws their own samples, writes their own walkthroughs, and forms their own opinion. What this artifact does is reduce the number of exceptions the auditor finds when they do.
The six sections below map to the four-phase 12-month sequence in the Field Guide. Sections 1 through 4 are Phase 1 and Phase 2 work and should be closed before the observation window opens. Sections 5 and 6 carry through the period of review and the pre-fieldwork dry run.
Section 1, TSC selection and scope
| # | Item | Pass criterion | Common failure | Note |
|---|---|---|---|---|
| 1.1 | Trust Services Criteria categories selected | Security (Common Criteria) is in scope by default; Confidentiality, Availability, Processing Integrity, and Privacy each carry a written in-or-out decision with named buyer rationale. | TSC scope decided by the auditor's template rather than by buyer demand; categories added late under sales pressure. | Adding a category in Phase 1 is cheap; adding it in Phase 3 doubles evidence work. |
| 1.2 | Confidentiality in scope | Confidentiality is included for any digital health SaaS handling PHI, identifiable health data, or customer-confidential clinical content; data classification policy supports the scope. | "We'll add Confidentiality next year" while the report is read by health-system buyers who expect it on the first run. | Almost always in scope for digital health; the exception is rare and should be defended in writing. |
| 1.3 | Availability in scope decision | Availability is included where a customer SLA, an enterprise health-system contract, or an acute-care use case makes uptime contractual; backup, recovery, and continuity controls support the scope. | Availability omitted to compress evidence work; first enterprise prospect requires it on procurement review. | The deal-driven category most commonly underscoped on first runs. |
| 1.4 | Privacy in scope decision | Privacy is excluded on a first run unless a specific buyer or a state-law obligation (e.g., consumer-health-data regimes) requires it; the exclusion is documented. | Privacy added optimistically without a privacy program to support it; findings cluster across CC9 and Privacy criteria. | Defer to renewal unless required; Privacy is rarely worth adding on a first Type II. |
| 1.5 | System description boundary | The system description names the service, the in-scope production environment, the boundary at the third-party API surface, the user populations, and the explicit out-of-scope systems (corporate IT, marketing site if non-PHI). | Boundary written at the corporate level; corporate email and HRIS pulled into scope unnecessarily; auditor samples spread across out-of-scope systems. | The boundary is the document the auditor reads first; it shapes every later request. |
| 1.6 | Subservice organizations identified | Every material sub-service is named: cloud infrastructure, PaaS, observability, identity, model and orchestration vendors, EHR integration layer, payment processor where applicable. | Cloud and EHR named; observability, identity, and orchestration left implicit and surfaced mid-engagement. | The subservice list anchors carve-out decisions and complementary controls. |
| 1.7 | Carve-out vs inclusion decisions | Each subservice has a written carve-out or inclusion decision; carve-outs reference the sub-service organization's own SOC 2 report; complementary user entity controls are documented. | Default carve-out applied without reading the subservice's report; complementary controls not enumerated; auditor flags during walkthroughs. | Inclusion is rare and expensive; defaults are carve-out plus complementary controls. |
| 1.8 | Period of review proposed | A defensible observation window is proposed: six months on the first run, starting at least 30 days after the last gap-remediation control went live, ending with enough buffer for fieldwork inside the calendar year. | Window starts the day gap remediation closes; controls evolve during the period; exceptions concentrate in months one and two. | The Field Guide covers the timing trade-off; treat the start date as a control. |
Section 2, Control design
| # | Item | Pass criterion | Common failure | Note |
|---|---|---|---|---|
| 2.1 | Logical access provisioning (CC6.1) | Provisioning is ticket-driven, role-based, and tied to the IdP; new-hire access requires manager approval and is granted only after acceptance. | Engineers grant peer access by chat request; no ticket trail; no role mapping; auditor cannot sample. | Ticketing-linked provisioning is the single highest-leverage control to design before the window opens. |
| 2.2 | Quarterly access review (CC6.2) | A documented review runs every quarter against the IdP-of-record, with reviewer attestation and date stamps; revocations are tracked to closure. | Review is a spreadsheet exported once a year, signed retroactively, with no revocation evidence. | A common first-time finding cluster, see "five things that fail" below. |
| 2.3 | Termination-day deprovisioning (CC6.2) | Termination triggers same-day deprovisioning across IdP, code repos, cloud consoles, and the production database; the workflow is documented and tested. | GitHub access for a former engineer still active 90 days after termination; SSO revoked but break-glass admin path missed. | Same-day deprovisioning is the bar the auditor will sample against. |
| 2.4 | Privileged access and break-glass (CC6.3) | Privileged accounts are inventoried, MFA-enforced including the break-glass path, and reviewed monthly; break-glass use generates an alert and a post-use review. | MFA enforced on SSO but not on the break-glass admin in the production database; no alerting on break-glass use. | Break-glass without MFA is the cleanest finding the auditor can write. |
| 2.5 | Change management (CC8.1) | Production changes are ticketed, peer-reviewed, tested in a non-production environment, and tracked to deployment; the same process covers backend, infrastructure, frontend, and data pipelines. | Change process exists for backend; marketing site, dashboard, and pipelines deploy ad-hoc. | Each unmanaged path produces an exception; close them before the window opens. |
| 2.6 | Emergency change handling (CC8.1) | Emergency changes follow a documented expedited path with retroactive ticket creation inside a defined SLA (target: 1 business day); emergency changes are reviewed monthly. | Engineers hotfix at 2 a.m. and never file a ticket; "emergency" is a workflow shortcut, not a documented exception. | Treat emergency change as a designed control, not a loophole. |
| 2.7 | Incident response runbook (CC7.4) | A current runbook exists with severity tiers, named on-call owners, escalation paths, communication templates, and post-incident review steps; it is reviewed at least annually. | Runbook authored at seed stage; current on-call rotation is a Slack channel; templates have not been updated since the company doubled. | The runbook is the artifact; the tabletop in 2.8 is the evidence it operates. |
| 2.8 | Incident response tabletop (CC7.4) | At least one tabletop exercise is run inside the observation window, with a documented scenario, participant list, decision log, and follow-up actions tracked to closure. | Runbook exists; tabletop has never run; auditor cannot sample operational evidence of the control. | Tabletops are sampled, not asserted; schedule one in Phase 2 and one mid-window. |
| 2.9 | Vendor management program (CC9.2) | A current vendor inventory exists, reconciled against procurement and cloud-bill records; tiered review schedule is in place; annual review is documented per tier. | Vendor list is a stale Notion page; cloud-billed vendors absent; review is "we asked for their SOC 2." | Section 4 of the Field Guide covers the silent-killer pattern in detail. |
| 2.10 | Business continuity and disaster recovery (A1.2) | A continuity plan exists with named recovery objectives (RTO, RPO), documented backup schedule, and an executed restore test inside the observation window. | Plan exists on paper; backups are configured but never restored; auditor cannot evidence the control operated. | A backup that has not been restored is not a backup the auditor will accept. |
Section 3, Evidence design
| # | Item | Pass criterion | Common failure | Note |
|---|---|---|---|---|
| 3.1 | IdP-backed access review evidence | Quarterly access reviews export from the IdP-of-record with reviewer identity, decision per user, and timestamp; the export is the evidence. | Review evidence is a screenshot pasted into a Google Doc; reviewer attribution lives in email threads. | If the evidence is not exported by the IdP, it will be exported by hand under audit pressure. |
| 3.2 | Ticketing-linked change evidence | Every production change has a ticket with linked PR, test record, approver, and deployment timestamp; the ticket is the evidence and is queryable for samples. | Tickets exist; deployments do not link back; auditor's sample of 25 changes returns 5 with no ticket. | The link is the control; design the ticket schema to enforce it. |
| 3.3 | Deployment pipeline evidence | The CI/CD system records who deployed what, when, after which approvals; logs are retained for the full period of review plus a buffer. | CI logs purge after 30 days; auditor's mid-window sample requests logs from month two and gets nothing. | Retention is a Phase 1 configuration, not a Phase 4 problem. |
| 3.4 | Encryption-at-rest verification | Encryption posture is verified by automated check (cloud-native or third-party CSPM): primary databases, snapshots, object storage, backups, and log stores are all confirmed encrypted, with evidence dated inside the period. | Posture is asserted from documentation; snapshot bucket is unencrypted and surfaces only when the auditor runs the cloud check. | The CC6 cluster gets fewer findings when posture is machine-evidenced. |
| 3.5 | Encryption-in-transit verification | TLS posture is verified across customer-facing endpoints, internal service mesh, and database connections; weak ciphers and protocols are not negotiable. | TLS confirmed on customer endpoints; internal service-to-service traffic over plaintext on a private network. | "It's a private network" is not the SOC 2 standard. |
| 3.6 | MFA coverage report | A report enumerates every workforce account, the MFA status, and any exceptions with a documented compensating control; the report is run inside the period and dated. | MFA enforced on SSO; service accounts and break-glass paths excluded; no enumeration confirms it. | Coverage is the evidence; "we have MFA" is not. |
| 3.7 | Internal control testing memo | A documented internal test runs each quarter against a sample of controls by someone other than the operator; the memo records what was tested, what was found, and what was remediated. | CC4 monitoring control absent; the operator is also the tester; no independent attestation. | Build this in Phase 2; the alternative is finding it missing in Phase 4. |
| 3.8 | Evidence retention and indexing | All evidence (access reviews, change tickets, tabletop logs, vendor reviews, restore tests) is retained in a single indexed location for the period plus 12 months; the index is queryable by control reference. | Evidence is scattered across Google Drive, Notion, Jira, and email; retrieval takes days; samples slip past response SLA. | The index is the audit; chase indexing in Phase 2, not in fieldwork. |
Section 4, HIPAA overlap
| # | Item | Pass criterion | Common failure | Note |
|---|---|---|---|---|
| 4.1 | BAA register | Every vendor with PHI exposure has a current BAA; the register is reconciled against the vendor inventory and cloud-bill records; expirations are tracked. | BAAs filed in folders by vendor name; no central register; expiration of the orchestration vendor's BAA goes unnoticed for months. | The register is the artifact the auditor and a future enterprise prospect both ask for. |
| 4.2 | Sub-BAA flow-down | BAAs include flow-down language requiring vendors to carry the BAA obligation forward to their own sub-processors; flow-down is verified for vendors with material PHI subprocessing. | Flow-down clause missing; orchestration vendor uses a model provider with no BAA in the chain, the pattern described in HIPAA AI Architecture: A Reference Implementation for Mid-Market Healthcare. | Flow-down is contractual and verifiable; verify, do not assume. |
| 4.3 | PHI access logging | Access to PHI in the production environment is logged with user identity, action, record class, and timestamp; logs are queryable by user and by record class. | Application-layer access logged; database-layer admin access not logged; admin can read PHI without trace. | The HIPAA Security Rule audit-control standard reads through the SOC 2 CC6 cluster on this point. |
| 4.4 | HIPAA breach response runbook | A specific breach response runbook covers the 60-day notification clock (45 CFR 164.410 for business associates), breach-of-unsecured-PHI determination, OCR-facing notification, customer-facing notification, and the documentation set; it is reviewed annually. | Generic incident runbook covers "incidents" without the HIPAA-specific timing and notification structure. | The Type II auditor will read the runbook; enterprise health-system buyers will read it harder. |
| 4.5 | Workforce HIPAA training | All workforce members complete HIPAA training on hire and annually; completion is tracked centrally and tied to identity. | Training tracked by the HR system in a way the security team cannot query; auditor cannot evidence coverage. | Sample-pull readiness is the test, not the training itself. |
| 4.6 | SOC 2 / HIPAA boundary in system description | The system description names the SOC 2 attestation boundary and explicitly states what is and is not in scope relative to the HIPAA Security Rule, written so an enterprise health-system procurement reviewer can read it. | System description silent on HIPAA; enterprise prospect rejects the report on procurement review. | This is the language the Field Guide warns about; it is best written with an auditor who knows the vertical. |
Section 5, Observation period staffing
| # | Item | Pass criterion | Common failure | Note |
|---|---|---|---|---|
| 5.1 | Named control operators | Every control has a named operator with a documented backup; coverage is in place for vacations, departures, and reorgs. | The security lead operates everything; one departure breaks the program mid-window. | Operator coverage is a Phase 2 design decision, not a Phase 3 scramble. |
| 5.2 | Evidence-collection cadence | A scheduled cadence is published: daily (deploy logs), weekly (access changes), monthly (MFA report, vendor activity), quarterly (access review, internal test, tabletop where scheduled). | Evidence collection is event-driven; the auditor's mid-window check finds gaps in months two and three. | Cadence is calendared, not aspirational. |
| 5.3 | Exception management discipline | Exceptions are logged in a register with date observed, control affected, root cause, remediation owner, and closure date; the register is reviewed monthly. | Exceptions surface during fieldwork because they were never logged; remediation is reconstructed retroactively. | The auditor would rather see a managed exception than a hidden one; logging is the discipline. |
| 5.4 | Mid-window auditor check-in | A mid-window check-in with the auditor is scheduled in the engagement letter; the agenda covers control evolution, exception register review, and direction confirmation. | No check-in; the first feedback the company gets is the draft report. | The check-in is the early-warning system; negotiate it into the engagement letter in Phase 1. |
| 5.5 | Workforce change handling during the window | New hires, role changes, and departures during the window route through the same provisioning and access-review controls as steady-state; the headcount delta is documented. | Hiring sprint mid-window outpaces the access workflow; new engineers have access by chat request, not ticket. | The window does not pause for growth; staffing model accounts for it. |
| 5.6 | Vendor and BAA changes during the window | New vendors added during the window go through the vendor-review control and BAA execution before production data flows; changes are documented in the register. | Engineering procures a new observability vendor mid-window; PHI flows for two weeks before BAA is signed. | This is a documented finding pattern; design the gate. |
Section 6, Pre-audit dry run
| # | Item | Pass criterion | Common failure | Note |
|---|---|---|---|---|
| 6.1 | Walkthrough rehearsal per control area | The compliance lead and the control operator walk through CC6, CC7, CC8, and CC9 with the partner; questions are scored against the auditor's likely sample requests. | Walkthrough happens for the first time with the auditor; operators are surprised by the questions. | One pass before fieldwork is the difference between a smooth walkthrough and a remediation list. |
| 6.2 | Sample-pull rehearsal | A representative sample (10–25 records per control) is pulled from the evidence index and reviewed against the auditor's likely request shape; gaps are remediated before fieldwork. | Sample is pulled for the first time inside the auditor's request window; gaps surface under SLA pressure. | The dry pull is cheap; the fieldwork pull is not. |
| 6.3 | System description final read | The system description is read end-to-end against the as-built environment; boundary statements, sub-service names, and complementary control language are confirmed accurate. | Description drifted during the window (vendor change, scope adjustment); auditor surfaces inconsistency in fieldwork. | This is the document the report is written against; freshness matters. |
| 6.4 | Exception register review with partner | The partner reviews the exception register with the compliance lead; each open exception has a closure plan or a documented management response. | Exceptions are presented to the auditor without a management response; draft report carries them as findings. | Open exceptions managed transparently are routinely closed without findings. |
| 6.5 | Bridge letter prepared | The bridge letter is management's own letter to customers, not an auditor deliverable, covering the gap between the end of the report period and the date the next report is issued. A template and a named signer are in place as part of the dry run. | Bridge letter is forgotten until the first prospect asks for it; drafting and sign-off then take weeks. | Most first-timers miss this; settle the template before the report issues. |
The five things that fail first-time audits
Manual quarterly access reviews that drift. The intent is sound: every quarter, the security lead exports a list of users from the IdP and a list of users from the production database, sits down with engineering managers, and walks through who should still have what. In practice, the review happens once, the spreadsheet is signed and filed, and the next three reviews are deferred under shipping pressure. By the time the auditor samples Q2, the company is in Q4 and the Q2 evidence is being reconstructed. The fix is IdP-backed automation in Phase 2, not heroic effort in Phase 4.
Change management with retroactive ticket creation. Engineers ship hotfixes at 2 a.m. The change goes out, the alarm clears, and the ticket gets filed the next morning, or the morning after, or never. The pattern reads cleanly to the auditor: every emergency change has a ticket dated after the deployment timestamp. The control did not operate; the documentation operated. The fix is a designed emergency-change path with a 1-business-day retroactive SLA and a monthly review.
Vendor risk reviews scoped narrower than the actual data flow. The vendor inventory says the company has six PHI-exposed vendors and BAAs are in place. The cloud bill says there are eleven. The orchestration vendor calls a model provider that the inventory does not list, and the BAA chain breaks at the call. The reviews are conducted against the inventory, not against the data flow. The fix is reconciling the inventory against procurement and cloud bills before the window opens, and again at every quarterly review.
Backup restore tests not actually tested. The continuity plan defines an RTO and an RPO. The backup configuration runs nightly. The restore has never been executed. The first time anyone tries is during incident response on a Saturday, and the auditor's request for a documented restore test in the period of review returns nothing. The fix is one scheduled restore test per quarter inside the observation window, with a memo of what was restored and how long it took.
Incident response plan never tabletop-exercised. The runbook is current. The on-call rotation is documented. No one has ever walked through a scenario together. When the auditor samples the CC7.4 control, the only evidence is the runbook itself, which evidences design but not operation. The fix is at least one tabletop in Phase 2 and one mid-window, modest events, two hours, with a documented scenario and a participant list.
Pre-audit go/no-go
| Section | Ready | Two-month delay | Re-baseline |
|---|---|---|---|
| TSC selection and scope | All 8 items pass; system description final-draft reviewed by partner; subservice carve-out decisions documented. | 6–7 items pass; scope decisions defensible but description needs a revision pass. | Fewer than 6 items pass; or 1.1, 1.5, or 1.8 fails. |
| Control design | All 10 items pass; each control has a named operator and documented evidence path. | 7–9 items pass; the gaps, typically 2.6, 2.8, or 2.10, have closure dates inside 60 days. | Fewer than 7 items pass; or 2.1, 2.2, or 2.5 fails. |
| Evidence design | All 8 items pass; evidence index in place and queryable. | 6–7 items pass; manual evidence paths exist for 1–2 controls with automation planned post-Type II. | Fewer than 6 items pass; or 3.1, 3.2, or 3.8 fails. |
| HIPAA overlap | All 6 items pass; BAA register reconciled; system description language confirmed by partner. | 4–5 items pass; BAA gaps tracked to closure inside 30 days. | Fewer than 4 items pass; or 4.1, 4.2, or 4.6 fails. |
| Observation period staffing | All 6 items pass; cadence calendared; mid-window check-in scheduled. | 4–5 items pass; staffing gaps named with hires or backups in flight. | Fewer than 4 items pass; or 5.1, 5.2, or 5.4 fails. |
| Pre-audit dry run | All 5 items pass; walkthrough and sample-pull rehearsals complete; bridge letter template drafted. | 3–4 items pass; one walkthrough deferred; partner-led close-out scheduled inside 30 days. | Fewer than 3 items pass; or 6.2 or 6.4 fails. |
A "ready" rating across all six sections is the bar for opening the observation window with confidence. "Two-month delay" anywhere is a defensible signal to push the window start by 30–60 days; the cost is a later report and the value is a clean attestation. "Re-baseline" in any section means the window should not open yet. Do not start on hope.
What this is not
This checklist does not replace the auditor's testing. The auditor draws their own samples, conducts their own walkthroughs, applies their own materiality judgments, and forms an independent opinion on whether controls operated as designed across the period of review. Nothing in this artifact constrains that opinion or substitutes for it.
It does not encode auditor-specific evidence preferences. Different firms write different request lists, accept different evidence formats, and apply different sampling thresholds. The criteria above describe the floor a defensible Type II program meets across firms; the ceiling, what a particular auditor wants to see, is settled in the engagement letter and the kickoff.
It does not opine on whether the report will sell. Saleability depends on the auditor's brand inside the buyer community, the system description's readability for procurement, and the absence of exceptions a competitor can weaponize. The Field Guide covers auditor selection and the system-description-as-sales-document pattern; this checklist supports them but does not replace them.
This checklist is frozen at lastReviewed. The TSC are versioned; AICPA guidance evolves; HIPAA Security Rule rulemaking is active in the 2026 window. Re-run against the current TSC and the partner's current guidance before each annual renewal. The readiness work this checklist supports is described under security and governance.