What this scorecard does
This scorecard is the instrument the deal team runs against an M&A target during the 21-day cyber and tech diligence window described in the paired guide, M&A Cyber and Tech Diligence: A 21-Day Field Guide for PE Operating Partners. It is not a maturity score and it is not a finding list. It is the worksheet that translates a target's cyber posture into an integration risk tier, sequenced remediation, and a price-and-rep-package recommendation that the investment committee can act on. Two neighbors are easy to confuse with it. The guide's 100-Day Cyber Integration Scorecard is a four-phase gating matrix built for each deal, not this document. The Post-Close Cyber Posture Scorecard grades the portco once the hundred days are running.
Two named owners run the rubric. The deal team partner at the sponsor, typically the operating partner or the deal lead, is the executive owner and is accountable to the IC for the headline cyber-attributable exposure number. The acquirer's CISO designate, the named individual who will own the combined-entity cyber posture on day one, whether full-time, fractional, or seconded from another portco, is the operational owner and produces the score. On a 21-day engagement, the scorecard is graded for the first time at day 14, alongside the findings pack the guide schedules for that day, and finalized at day 21, alongside the written report, which the guide calls the Diligence Quantification Memo. It is run once per target and is not re-scored after close.
This scorecard does not replace counsel's review of the SPA reps and warranties workup. It does not replace financial diligence or QofE adjustments. It does not encode buyer-side regulatory overlay (the acquirer's own framework obligations that carry through to the combined entity). It produces one output: a defensible integration risk tier with sequencing, scaled to the target's posture and weighted to where the dollar exposure actually lives. The cost-to-cure number itself is worked up in the diligence report, with this score as an input.
Scoring rubric
Every item across the eight sections is scored on a three-point scale:
- 0: Absent or evidence-negative. The control or artifact is missing, broken, or actively contradicted by the data-room and target-interview record. Default first-pass score for any item the target's CTO/CISO equivalent cannot evidence in writing during the day 4-7 interview window.
- 1: Present but not deal-defensible. The control exists in some form but is not in a state the acquirer's diligence team would defend in front of an IC, an R&W underwriter, or a regulator. Most mid-market targets land at 1 on a meaningful share of items; the work of the post-close 100 days is moving them to 2.
- 2: Present, defensible, and evidenced. The control is in place, the artifact is current, and the target produced it from operational systems (not from policy documents) during the day 8-10 internal access window.
Each item scores 0, 1 or 2, and each section carries the weight in its heading. Convert a section's raw points to its weight: section score = raw points ÷ raw maximum × section points. Sections A, B, D and E have eight items each, a raw maximum of 16 against a weight of 15, so a raw 12 becomes 12 ÷ 16 × 15 = 11.25. Sections C, F, G and H have five items each, so the raw maximum of 10 is already the weight. Add the eight section scores and round to the nearest whole number. Total possible score is 100 points. Interpretation tiers:
- 80 or above: clean integration. Standard integration plan. No price adjustment driven by cyber.
- 60 to 79: mid-risk integration. Standard integration plan with named risks documented and reps language tightened where weak sections concentrate. No headline price adjustment, but the integration cost-to-cure number goes into the IC memo.
- Below 60: high-risk integration. Cyber-attributable price adjustment, escrow, and extended TSA recommended. The diligence report's headline exposure number is materially non-zero and the rep package is rebuilt, not edited.
If the deal team partner and the CISO designate disagree on a score, the lower score is taken. Conservatism on the way in is what produces a diligence report the IC trusts on the way out.
Section A: Identity and access (15 points; 8 items, raw maximum 16)
| Item | 0 | 1 | 2 | Notes |
|---|---|---|---|---|
| Single IdP for all production workforce | Multiple directories, no consolidation plan | Consolidation in flight, dual directories live | One IdP, all workforce migrated, legacy directories disabled | Drives day-1 identity-bridge cost |
| Phishing-resistant MFA on privileged accounts | Admin MFA optional, SMS, or missing | TOTP-only or inconsistent across admin roles | FIDO2 / passkeys on all privileged roles, break-glass governed | Carrier underwriting hits this first |
| Stale and offboarded identities under 5% of headcount | > 15% identity bloat against HR roster | 5-15% bloat, purge in flight | < 5% bloat, monthly reconciliation against HR + AP + SaaS | Section 2 of the Field Guide names this directly |
| Service-account inventory with named human owners | No inventory or owners | Inventory exists, owners not assigned | Every service account has named human owner, purpose, last-rotation date | Lateral-movement path |
| Monthly access reviews running with evidenced approver | No periodic review | Ad-hoc review run once | Monthly review with documented approver and ticketed exceptions | Reviewed evidence is the artifact, not the policy |
| Offboarding closes within 24 hours of HR trigger | > 7 days or untracked | Tracked, exceeds 24h on a measurable share | SLA met and measured monthly | Distinct from HR-side offboarding |
| Third-party / external access reviewed | No review | List exists, decisions not executed | Every external party reviewed, decisions executed, list re-run quarterly | MSPs, prior owners, agencies, contractors |
| Privileged-action logging centralized | Logging absent or local-only | Centralized for IdP only | Centralized across IdP, financial systems, cloud control plane | Day-1 inheritance for the SOC |
Section B: Cloud and infrastructure (15 points; 8 items, raw maximum 16)
| Item | 0 | 1 | 2 | Notes |
|---|---|---|---|---|
| Cloud account inventory complete and joined to billing | Account list incomplete or unreconciled | List exists, not joined to spend | Full inventory, joined to AP and billing console, ownership assigned | First step of footprint inheritance |
| Production root / global admin custody documented | Root accounts in known prior-IT hands | Rotation in flight, MFA inconsistent | Roots rotated post-LOI, hardware MFA, break-glass documented | Day-1 priority on technical takeover |
| CSPM live across all production accounts | No CSPM tooling | CSPM deployed, findings not triaged | CSPM live, findings triaged weekly, owners assigned | Cloud-native baseline |
| Native threat detection on (GuardDuty / Defender / SCC) | Disabled in at least one production account | Enabled but not centralized | Enabled across all accounts, alerts routed centrally | Day-1 detection inheritance |
| Public exposure inventory current | No inventory | Run once, not refreshed | Refreshed weekly via tooling, exceptions ticketed | Open ports, S3 buckets, public IPs, certs |
| IaC coverage and drift posture documented | No IaC, drift unknown | Partial IaC, drift untracked | IaC for all production, drift detection live | Drives integration-cost P50 vs P90 |
| Secrets management posture | Secrets in code, env files, or Slack | Vault deployed, coverage incomplete | Vault deployed, code scanning catches regressions, rotation cadence set | Section 2 of the Field Guide flags clear-text secrets |
| Production-environment encryption posture | Inconsistent or absent | On by default, key management ad-hoc | Encryption enforced with documented key management and rotation | At-rest and in-transit |
Section C: Endpoint and device fleet (10 points; 5 items, raw maximum 10)
| Item | 0 | 1 | 2 | Notes |
|---|---|---|---|---|
| EDR coverage on every corporate endpoint | < 80% or unknown | 80-94%, gap closing | 95%+ with monthly attestation | First R&W underwriter question |
| Device-fleet age and refresh posture | Refresh > 5 years or untracked | Refresh tracked, partial coverage | Documented refresh cadence, < 4 years average age | Day-1 capex inheritance |
| MDM deployed to corporate fleet | No MDM | MDM partial, BYOD untracked | MDM on every corporate device, BYOD policy with conditional access | Drives integration of the acquirer's device standard |
| BYOD posture documented and bounded | BYOD ungoverned, corporate data on personal devices | BYOD policy exists, enforcement inconsistent | BYOD bounded by conditional access, MAM where applicable, no corporate data on personal storage | |
| Patch posture meets SLA (critical < 14 days) | Patch state unknown | Reporting exists, SLA not met | SLA met, reporting monthly | Section 2 of the Field Guide flags M&A-pause patch lag |
Section D: Detection and response maturity (15 points; 8 items, raw maximum 16)
| Item | 0 | 1 | 2 | Notes |
|---|---|---|---|---|
| Central log destination with retention | Logs siloed across systems | Central destination exists, coverage incomplete | Centralized auth, EDR, financial, and cloud control-plane logs with retention | Logging baseline for IR |
| Alert routing to a named human, 24x7 | Alerts route to a shared mailbox or nobody | Routed to a named human, business hours only | 24x7 coverage, named primary and secondary, escalation tested | MDR / MSSP contract counts if scoped |
| Incident response plan specific to this entity | No plan or stale plan | Generic plan, not socialized | Plan socialized, named contacts, decision authorities, communication tree | Generic plans grade 1, never 2 |
| Tabletop exercise run within last 12 months | None on record | Scheduled but not run | Run with executive participation, lessons logged | Records reviewed during day 4-7 interviews |
| Forensic and IR retainer named, panel-aligned | No retainer | Retainer named, scope undefined | Retainer named with hourly cap, contact tested, panel approved by carrier | Carrier-aligned panel matters at notice |
| Mean-time-to-detect target set and measured | No target | Target set, not measured | Target measured monthly, trend reported | Aspirational MTTD beats none |
| Detection coverage mapped to vertical threats | No mapping | Mapping drafted | Mapping complete, gaps tracked | Vertical-specific threat models |
| Notification-obligation register reviewed by counsel | Unknown | Drafted, not legal-reviewed | Reviewed by counsel, contacts current, drill complete | Time-to-notify clocks vary by regulator |
Section E: Data and PII inventory (15 points; 8 items, raw maximum 16)
| Item | 0 | 1 | 2 | Notes |
|---|---|---|---|---|
| Data inventory and classification current | No inventory | Inventory drafted | Inventory current, classification applied, refreshed annually | Input to R&W and regulatory exposure |
| Regulated-data map (PHI, PCI, PII, FERPA, financial) | Unknown | Mapped at high level | Full map: what data, where stored, which system of record | Drives Field Guide Category B exposure |
| Data residency and cross-border posture | Unknown | Documented, not validated | Documented, validated against contracts and regulatory regimes | Material for cross-border targets and US sub-processors |
| Retention schedules defined and enforced | No schedule | Defined, not enforced | Defined and enforced through tooling, exceptions ticketed | Older data is older liability |
| Collaboration-tool exposure register (IP-leak) | None | Register drafted | Register complete, exceptions accepted or remediated | Section 2 of the Field Guide names this |
| Customer-data sub-processor flow documented | Unknown | Documented, not reconciled to contracts | Documented and reconciled, no flows outside contracted scope | Section 2 flags pre-close third-party sharing |
| Source-code, secrets, and customer credentials posture | Hard-coded secrets present in code | Scanning live, regressions tracked | Scanning enforced in CI, no secrets in code, customer credentials never in collaboration tools | Material on software-product targets |
| Privacy notice and contractual obligations mapped | Unmapped | Mapped at high level | Full map: customer contracts, regulator obligations, vendor flow-downs | State privacy regimes vary materially |
Section F: Compliance and customer commitments (10 points; 5 items, raw maximum 10)
| Item | 0 | 1 | 2 | Notes |
|---|---|---|---|---|
| Customer security commitments register (MSAs, DPAs, security exhibits) | No register | Drafted from sample contracts | Register complete, top 20 customers reviewed for change-of-control and security exhibits | Drives the customer-side integration noise |
| Framework attestations claimed and evidenced (SOC 2, HITRUST, ISO, PCI) | Claimed without evidence | Last report > 18 months old or with material qualifications | Current report, no material qualifications, bridge letter where applicable | Targets often claim what they cannot evidence |
| Regulatory commitments register (HIPAA, GLBA, state DFS, state privacy) | Unknown | Drafted, not reconciled to data inventory | Register complete, reconciled to Section E inventory, gaps owned | Buyer becomes controller of record on close |
| SLAs and uptime commitments documented and met | Commitments unknown or routinely missed | Documented, occasional misses | Documented, met, reported to customers on cadence | Material for SaaS targets |
| Audit trail and evidence artefact set | No artefact set | Artefacts ad-hoc | Artefact set defined per control, stored centrally, audit-ready format | What the buyer inherits and what the next exit will require |
Section G: Vendor and supply chain (10 points; 5 items, raw maximum 10)
| Item | 0 | 1 | 2 | Notes |
|---|---|---|---|---|
| Vendor master file complete and joined to AP | AP file not reconciled to vendor list | Reconciliation in flight | Vendor master maintained, joined to AP, refreshed quarterly | Source of truth for vendor inheritance |
| Shadow-SaaS discovery run and reconciled | No discovery | Discovery run, not reconciled | Run, reconciled, decisions made on every shadow tool | Field Guide section 2 flags procurement vs actual data flows |
| BAA / DPA register with renewal triggers (where applicable) | No register, gaps unknown | Register exists, renewal dates not tracked | Register complete, renewal triggers in calendar, gaps in flight with counsel | N/A grade allowed if not in a BAA-bearing vertical, taken as 2 |
| Change-of-control clauses reviewed for top vendors | No review | Top-spend vendors identified, not reviewed | Top 20 vendors reviewed for change-of-control treatment and notice obligations | Material before signing, not after |
| Sub-processor flow-down obligations tracked | Untracked | Tracked manually, not refreshed | Tracked in vendor master, refreshed at every renewal | Carries through to BAA register |
Section H: Material incident history (10 points; 5 items, raw maximum 10)
| Item | 0 | 1 | 2 | Notes |
|---|---|---|---|---|
| Disclosed incident register, last 36 months | No register | Register exists, gaps known | Register complete, post-mortems on file, remediation evidenced | Disclosed in the data room |
| Undisclosed-incident signal review (best-effort) | No external review | Review run, signal not reconciled to internal record | Review run (breach corpora, exposed credential, dark-web pasting), reconciled to internal record, gaps noted | Field Guide day 4-7 external posture review |
| Customer notification history | Unknown | Disclosed but not reconciled to register | Disclosed, reconciled to register, customer-side closeout documented | Material for R&W underwriting |
| Regulatory notification history | Unknown | Disclosed at high level | Disclosed, reconciled to register, regulator-side closeout documented or in flight | Drives Field Guide Category B exposure |
| Insurance claim history | Unknown | Disclosed without supporting documents | Disclosed with carrier letters, claim posture closed or reserved | Renewal posture inheritance |
Total scoring and interpretation
Convert each section's raw points to its weight, sum the eight section scores and round to the nearest whole number. The maximum is 100 (15 + 15 + 10 + 15 + 15 + 10 + 10 + 10). Interpretation tiers map directly to deal action:
- Below 60: high-risk integration. Price adjustment + escrow + extended TSA. The diligence report's headline carries a material cyber-attributable hold-back. The recommended posture is a cyber-specific escrow on top of the standard rep escrow, an extended TSA window with the seller covering the cost-to-cure on named items, and a re-cut of the rep package by counsel. If the deal does not flex, the recommendation is to walk.
- 60 to 79: mid-risk integration. Standard plan with named risks. The diligence report's headline is non-zero but does not drive a price adjustment. The rep package is tightened on the weak sections (commonly A, D, and E) and the integration cost-to-cure number goes into the IC memo as a flagged year-one operating expense. Standard escrow is sufficient.
- 80 or above: clean integration. No cyber-attributable price adjustment. Standard rep package. Day-1 to Day-100 sequencing follows the 100-day post-close playbook on hygiene cadence; the cost-to-cure is bounded and absorbed within the integration budget.
Day-1 to Day-100 sequencing
Sequencing is driven by which sections graded weakest. The table below maps the weakest-section signal into where the integration team starts on day one and what gates close at days 30, 60, and 100.
| Weakest section at day 21 | Days 1-30 | Days 31-60 | Days 61-100 |
|---|---|---|---|
| A, Identity and access | Identity inventory; emergency deprovisioning of departed and stale accounts; root rotation; admin MFA hardening | Single-IdP migration in flight; service-account inventory with named owners; access-review cadence stood up | Single IdP cut over; access-review running monthly; identity bloat under 5% |
| B, Cloud and infrastructure | Account inventory joined to billing; root custody documented; CSPM gap closure on critical findings | IaC and drift posture stood up; secrets management deployed; encryption posture closed | Public exposure inventory refreshed weekly; CSPM findings triaged weekly; integration-cost P50 confirmed |
| C, Endpoint and device fleet | EDR coverage measured, with a dated plan to reach 95%+; MDM coverage gap closure; patch SLA reporting stood up | EDR at 90%+ by week six; refresh capex committed; BYOD policy bounded by conditional access | EDR at 95%+ by week eleven; patch SLA met and reported; refresh in flight against committed capex |
| D, Detection and response | Central log destination live; 24x7 alert routing in place; IR retainer named and panel-aligned | IR plan socialized to combined team; tabletop scheduled; MTTD target set | Tabletop run; MTTD measured monthly; detection coverage mapped to vertical |
| E, Data and PII inventory | Regulated-data map drafted; collaboration-tool exposure register opened; secrets-in-code remediation kicked off | Sub-processor flow reconciled to contracts; retention schedules defined; data residency validated | Inventory and classification current; exposure register closed; privacy obligations mapped |
| F, Compliance and customer commitments | Customer commitments register drafted from top 20 contracts; framework attestation gap analysis | Regulatory commitments reconciled to data inventory; bridge letter or audit booked | Commitments register current; SLAs measured; evidence artefact set defined |
| G, Vendor and supply chain | Vendor master reconciled to AP; shadow-SaaS discovery run; change-of-control clauses reviewed for top vendors | BAA / DPA register complete; sub-processor flow-downs tracked | Vendor master refreshed; renewal triggers in calendar; deduplication decisions ratified |
| H, Material incident history | Disclosed-incident register reconciled to data room; undisclosed-signal review run | Customer and regulator notification posture documented; carrier letters reconciled | Year-one R&W posture confirmed; renewal-ready evidence pack assembled |
The sequencing assumes the post-close playbook is run alongside this scorecard. The weakest section at day 21 dictates where days 1-30 spends its first dollar; the rest follows the standard 100-day cadence.
What this is not
This scorecard does not replace a SPA reps and warranties workup. The reps language is counsel's product; this scorecard is an input to it, not a substitute. It does not encode buyer-side regulatory overlay: the acquirer's own framework obligations, sector regulators, and customer commitments that carry through to the combined entity are scoped separately. It does not replace financial diligence, QofE, or commercial diligence; the cyber diligence report sits alongside those workstreams, not in place of them. It does not replace a cyber insurance application; the renewal questionnaire is structurally similar but has carrier-specific questions and underwriting attestations this scorecard does not encode.
It is also frozen at the lastReviewed date, 2026-11-14.
The diligence value compounds when the scorecard, the diligence report, and the post-close 100-day cadence are run together. The deal team partner who reads the Field Guide and runs the rubric themselves is doing it right. The deal team partner who hands it to the firm is buying a fixed-scope written report on a fixed timeline. That report is M&A technology diligence, scoped through our security and governance practice. Either path produces the deliverable. The deliverable is what survives the deal.