Skip to main content
    Securem Advisory
    Back to the paired field guide
    ScorecardReviewed Nov 14, 2026

    M&A Cyber Integration Scorecard

    21-day cyber diligence scorecard for M&A targets that translates a target's cyber posture into a deal-affecting integration risk tier, with weighted control families and dependency-ordered remediation.

    Read the field guide

    What this scorecard does

    This scorecard is the instrument the deal team runs against an M&A target during the 21-day cyber and tech diligence window described in the paired guide, M&A Cyber and Tech Diligence: A 21-Day Field Guide for PE Operating Partners. It is not a maturity score and it is not a finding list. It is the worksheet that translates a target's cyber posture into an integration risk tier, sequenced remediation, and a price-and-rep-package recommendation that the investment committee can act on. Two neighbors are easy to confuse with it. The guide's 100-Day Cyber Integration Scorecard is a four-phase gating matrix built for each deal, not this document. The Post-Close Cyber Posture Scorecard grades the portco once the hundred days are running.

    Two named owners run the rubric. The deal team partner at the sponsor, typically the operating partner or the deal lead, is the executive owner and is accountable to the IC for the headline cyber-attributable exposure number. The acquirer's CISO designate, the named individual who will own the combined-entity cyber posture on day one, whether full-time, fractional, or seconded from another portco, is the operational owner and produces the score. On a 21-day engagement, the scorecard is graded for the first time at day 14, alongside the findings pack the guide schedules for that day, and finalized at day 21, alongside the written report, which the guide calls the Diligence Quantification Memo. It is run once per target and is not re-scored after close.

    This scorecard does not replace counsel's review of the SPA reps and warranties workup. It does not replace financial diligence or QofE adjustments. It does not encode buyer-side regulatory overlay (the acquirer's own framework obligations that carry through to the combined entity). It produces one output: a defensible integration risk tier with sequencing, scaled to the target's posture and weighted to where the dollar exposure actually lives. The cost-to-cure number itself is worked up in the diligence report, with this score as an input.

    Scoring rubric

    Every item across the eight sections is scored on a three-point scale:

    • 0: Absent or evidence-negative. The control or artifact is missing, broken, or actively contradicted by the data-room and target-interview record. Default first-pass score for any item the target's CTO/CISO equivalent cannot evidence in writing during the day 4-7 interview window.
    • 1: Present but not deal-defensible. The control exists in some form but is not in a state the acquirer's diligence team would defend in front of an IC, an R&W underwriter, or a regulator. Most mid-market targets land at 1 on a meaningful share of items; the work of the post-close 100 days is moving them to 2.
    • 2: Present, defensible, and evidenced. The control is in place, the artifact is current, and the target produced it from operational systems (not from policy documents) during the day 8-10 internal access window.

    Each item scores 0, 1 or 2, and each section carries the weight in its heading. Convert a section's raw points to its weight: section score = raw points ÷ raw maximum × section points. Sections A, B, D and E have eight items each, a raw maximum of 16 against a weight of 15, so a raw 12 becomes 12 ÷ 16 × 15 = 11.25. Sections C, F, G and H have five items each, so the raw maximum of 10 is already the weight. Add the eight section scores and round to the nearest whole number. Total possible score is 100 points. Interpretation tiers:

    • 80 or above: clean integration. Standard integration plan. No price adjustment driven by cyber.
    • 60 to 79: mid-risk integration. Standard integration plan with named risks documented and reps language tightened where weak sections concentrate. No headline price adjustment, but the integration cost-to-cure number goes into the IC memo.
    • Below 60: high-risk integration. Cyber-attributable price adjustment, escrow, and extended TSA recommended. The diligence report's headline exposure number is materially non-zero and the rep package is rebuilt, not edited.

    If the deal team partner and the CISO designate disagree on a score, the lower score is taken. Conservatism on the way in is what produces a diligence report the IC trusts on the way out.

    Section A: Identity and access (15 points; 8 items, raw maximum 16)

    Item012Notes
    Single IdP for all production workforceMultiple directories, no consolidation planConsolidation in flight, dual directories liveOne IdP, all workforce migrated, legacy directories disabledDrives day-1 identity-bridge cost
    Phishing-resistant MFA on privileged accountsAdmin MFA optional, SMS, or missingTOTP-only or inconsistent across admin rolesFIDO2 / passkeys on all privileged roles, break-glass governedCarrier underwriting hits this first
    Stale and offboarded identities under 5% of headcount> 15% identity bloat against HR roster5-15% bloat, purge in flight< 5% bloat, monthly reconciliation against HR + AP + SaaSSection 2 of the Field Guide names this directly
    Service-account inventory with named human ownersNo inventory or ownersInventory exists, owners not assignedEvery service account has named human owner, purpose, last-rotation dateLateral-movement path
    Monthly access reviews running with evidenced approverNo periodic reviewAd-hoc review run onceMonthly review with documented approver and ticketed exceptionsReviewed evidence is the artifact, not the policy
    Offboarding closes within 24 hours of HR trigger> 7 days or untrackedTracked, exceeds 24h on a measurable shareSLA met and measured monthlyDistinct from HR-side offboarding
    Third-party / external access reviewedNo reviewList exists, decisions not executedEvery external party reviewed, decisions executed, list re-run quarterlyMSPs, prior owners, agencies, contractors
    Privileged-action logging centralizedLogging absent or local-onlyCentralized for IdP onlyCentralized across IdP, financial systems, cloud control planeDay-1 inheritance for the SOC

    Section B: Cloud and infrastructure (15 points; 8 items, raw maximum 16)

    Item012Notes
    Cloud account inventory complete and joined to billingAccount list incomplete or unreconciledList exists, not joined to spendFull inventory, joined to AP and billing console, ownership assignedFirst step of footprint inheritance
    Production root / global admin custody documentedRoot accounts in known prior-IT handsRotation in flight, MFA inconsistentRoots rotated post-LOI, hardware MFA, break-glass documentedDay-1 priority on technical takeover
    CSPM live across all production accountsNo CSPM toolingCSPM deployed, findings not triagedCSPM live, findings triaged weekly, owners assignedCloud-native baseline
    Native threat detection on (GuardDuty / Defender / SCC)Disabled in at least one production accountEnabled but not centralizedEnabled across all accounts, alerts routed centrallyDay-1 detection inheritance
    Public exposure inventory currentNo inventoryRun once, not refreshedRefreshed weekly via tooling, exceptions ticketedOpen ports, S3 buckets, public IPs, certs
    IaC coverage and drift posture documentedNo IaC, drift unknownPartial IaC, drift untrackedIaC for all production, drift detection liveDrives integration-cost P50 vs P90
    Secrets management postureSecrets in code, env files, or SlackVault deployed, coverage incompleteVault deployed, code scanning catches regressions, rotation cadence setSection 2 of the Field Guide flags clear-text secrets
    Production-environment encryption postureInconsistent or absentOn by default, key management ad-hocEncryption enforced with documented key management and rotationAt-rest and in-transit

    Section C: Endpoint and device fleet (10 points; 5 items, raw maximum 10)

    Item012Notes
    EDR coverage on every corporate endpoint< 80% or unknown80-94%, gap closing95%+ with monthly attestationFirst R&W underwriter question
    Device-fleet age and refresh postureRefresh > 5 years or untrackedRefresh tracked, partial coverageDocumented refresh cadence, < 4 years average ageDay-1 capex inheritance
    MDM deployed to corporate fleetNo MDMMDM partial, BYOD untrackedMDM on every corporate device, BYOD policy with conditional accessDrives integration of the acquirer's device standard
    BYOD posture documented and boundedBYOD ungoverned, corporate data on personal devicesBYOD policy exists, enforcement inconsistentBYOD bounded by conditional access, MAM where applicable, no corporate data on personal storage
    Patch posture meets SLA (critical < 14 days)Patch state unknownReporting exists, SLA not metSLA met, reporting monthlySection 2 of the Field Guide flags M&A-pause patch lag

    Section D: Detection and response maturity (15 points; 8 items, raw maximum 16)

    Item012Notes
    Central log destination with retentionLogs siloed across systemsCentral destination exists, coverage incompleteCentralized auth, EDR, financial, and cloud control-plane logs with retentionLogging baseline for IR
    Alert routing to a named human, 24x7Alerts route to a shared mailbox or nobodyRouted to a named human, business hours only24x7 coverage, named primary and secondary, escalation testedMDR / MSSP contract counts if scoped
    Incident response plan specific to this entityNo plan or stale planGeneric plan, not socializedPlan socialized, named contacts, decision authorities, communication treeGeneric plans grade 1, never 2
    Tabletop exercise run within last 12 monthsNone on recordScheduled but not runRun with executive participation, lessons loggedRecords reviewed during day 4-7 interviews
    Forensic and IR retainer named, panel-alignedNo retainerRetainer named, scope undefinedRetainer named with hourly cap, contact tested, panel approved by carrierCarrier-aligned panel matters at notice
    Mean-time-to-detect target set and measuredNo targetTarget set, not measuredTarget measured monthly, trend reportedAspirational MTTD beats none
    Detection coverage mapped to vertical threatsNo mappingMapping draftedMapping complete, gaps trackedVertical-specific threat models
    Notification-obligation register reviewed by counselUnknownDrafted, not legal-reviewedReviewed by counsel, contacts current, drill completeTime-to-notify clocks vary by regulator

    Section E: Data and PII inventory (15 points; 8 items, raw maximum 16)

    Item012Notes
    Data inventory and classification currentNo inventoryInventory draftedInventory current, classification applied, refreshed annuallyInput to R&W and regulatory exposure
    Regulated-data map (PHI, PCI, PII, FERPA, financial)UnknownMapped at high levelFull map: what data, where stored, which system of recordDrives Field Guide Category B exposure
    Data residency and cross-border postureUnknownDocumented, not validatedDocumented, validated against contracts and regulatory regimesMaterial for cross-border targets and US sub-processors
    Retention schedules defined and enforcedNo scheduleDefined, not enforcedDefined and enforced through tooling, exceptions ticketedOlder data is older liability
    Collaboration-tool exposure register (IP-leak)NoneRegister draftedRegister complete, exceptions accepted or remediatedSection 2 of the Field Guide names this
    Customer-data sub-processor flow documentedUnknownDocumented, not reconciled to contractsDocumented and reconciled, no flows outside contracted scopeSection 2 flags pre-close third-party sharing
    Source-code, secrets, and customer credentials postureHard-coded secrets present in codeScanning live, regressions trackedScanning enforced in CI, no secrets in code, customer credentials never in collaboration toolsMaterial on software-product targets
    Privacy notice and contractual obligations mappedUnmappedMapped at high levelFull map: customer contracts, regulator obligations, vendor flow-downsState privacy regimes vary materially

    Section F: Compliance and customer commitments (10 points; 5 items, raw maximum 10)

    Item012Notes
    Customer security commitments register (MSAs, DPAs, security exhibits)No registerDrafted from sample contractsRegister complete, top 20 customers reviewed for change-of-control and security exhibitsDrives the customer-side integration noise
    Framework attestations claimed and evidenced (SOC 2, HITRUST, ISO, PCI)Claimed without evidenceLast report > 18 months old or with material qualificationsCurrent report, no material qualifications, bridge letter where applicableTargets often claim what they cannot evidence
    Regulatory commitments register (HIPAA, GLBA, state DFS, state privacy)UnknownDrafted, not reconciled to data inventoryRegister complete, reconciled to Section E inventory, gaps ownedBuyer becomes controller of record on close
    SLAs and uptime commitments documented and metCommitments unknown or routinely missedDocumented, occasional missesDocumented, met, reported to customers on cadenceMaterial for SaaS targets
    Audit trail and evidence artefact setNo artefact setArtefacts ad-hocArtefact set defined per control, stored centrally, audit-ready formatWhat the buyer inherits and what the next exit will require

    Section G: Vendor and supply chain (10 points; 5 items, raw maximum 10)

    Item012Notes
    Vendor master file complete and joined to APAP file not reconciled to vendor listReconciliation in flightVendor master maintained, joined to AP, refreshed quarterlySource of truth for vendor inheritance
    Shadow-SaaS discovery run and reconciledNo discoveryDiscovery run, not reconciledRun, reconciled, decisions made on every shadow toolField Guide section 2 flags procurement vs actual data flows
    BAA / DPA register with renewal triggers (where applicable)No register, gaps unknownRegister exists, renewal dates not trackedRegister complete, renewal triggers in calendar, gaps in flight with counselN/A grade allowed if not in a BAA-bearing vertical, taken as 2
    Change-of-control clauses reviewed for top vendorsNo reviewTop-spend vendors identified, not reviewedTop 20 vendors reviewed for change-of-control treatment and notice obligationsMaterial before signing, not after
    Sub-processor flow-down obligations trackedUntrackedTracked manually, not refreshedTracked in vendor master, refreshed at every renewalCarries through to BAA register

    Section H: Material incident history (10 points; 5 items, raw maximum 10)

    Item012Notes
    Disclosed incident register, last 36 monthsNo registerRegister exists, gaps knownRegister complete, post-mortems on file, remediation evidencedDisclosed in the data room
    Undisclosed-incident signal review (best-effort)No external reviewReview run, signal not reconciled to internal recordReview run (breach corpora, exposed credential, dark-web pasting), reconciled to internal record, gaps notedField Guide day 4-7 external posture review
    Customer notification historyUnknownDisclosed but not reconciled to registerDisclosed, reconciled to register, customer-side closeout documentedMaterial for R&W underwriting
    Regulatory notification historyUnknownDisclosed at high levelDisclosed, reconciled to register, regulator-side closeout documented or in flightDrives Field Guide Category B exposure
    Insurance claim historyUnknownDisclosed without supporting documentsDisclosed with carrier letters, claim posture closed or reservedRenewal posture inheritance

    Total scoring and interpretation

    Convert each section's raw points to its weight, sum the eight section scores and round to the nearest whole number. The maximum is 100 (15 + 15 + 10 + 15 + 15 + 10 + 10 + 10). Interpretation tiers map directly to deal action:

    • Below 60: high-risk integration. Price adjustment + escrow + extended TSA. The diligence report's headline carries a material cyber-attributable hold-back. The recommended posture is a cyber-specific escrow on top of the standard rep escrow, an extended TSA window with the seller covering the cost-to-cure on named items, and a re-cut of the rep package by counsel. If the deal does not flex, the recommendation is to walk.
    • 60 to 79: mid-risk integration. Standard plan with named risks. The diligence report's headline is non-zero but does not drive a price adjustment. The rep package is tightened on the weak sections (commonly A, D, and E) and the integration cost-to-cure number goes into the IC memo as a flagged year-one operating expense. Standard escrow is sufficient.
    • 80 or above: clean integration. No cyber-attributable price adjustment. Standard rep package. Day-1 to Day-100 sequencing follows the 100-day post-close playbook on hygiene cadence; the cost-to-cure is bounded and absorbed within the integration budget.

    Day-1 to Day-100 sequencing

    Sequencing is driven by which sections graded weakest. The table below maps the weakest-section signal into where the integration team starts on day one and what gates close at days 30, 60, and 100.

    Weakest section at day 21Days 1-30Days 31-60Days 61-100
    A, Identity and accessIdentity inventory; emergency deprovisioning of departed and stale accounts; root rotation; admin MFA hardeningSingle-IdP migration in flight; service-account inventory with named owners; access-review cadence stood upSingle IdP cut over; access-review running monthly; identity bloat under 5%
    B, Cloud and infrastructureAccount inventory joined to billing; root custody documented; CSPM gap closure on critical findingsIaC and drift posture stood up; secrets management deployed; encryption posture closedPublic exposure inventory refreshed weekly; CSPM findings triaged weekly; integration-cost P50 confirmed
    C, Endpoint and device fleetEDR coverage measured, with a dated plan to reach 95%+; MDM coverage gap closure; patch SLA reporting stood upEDR at 90%+ by week six; refresh capex committed; BYOD policy bounded by conditional accessEDR at 95%+ by week eleven; patch SLA met and reported; refresh in flight against committed capex
    D, Detection and responseCentral log destination live; 24x7 alert routing in place; IR retainer named and panel-alignedIR plan socialized to combined team; tabletop scheduled; MTTD target setTabletop run; MTTD measured monthly; detection coverage mapped to vertical
    E, Data and PII inventoryRegulated-data map drafted; collaboration-tool exposure register opened; secrets-in-code remediation kicked offSub-processor flow reconciled to contracts; retention schedules defined; data residency validatedInventory and classification current; exposure register closed; privacy obligations mapped
    F, Compliance and customer commitmentsCustomer commitments register drafted from top 20 contracts; framework attestation gap analysisRegulatory commitments reconciled to data inventory; bridge letter or audit bookedCommitments register current; SLAs measured; evidence artefact set defined
    G, Vendor and supply chainVendor master reconciled to AP; shadow-SaaS discovery run; change-of-control clauses reviewed for top vendorsBAA / DPA register complete; sub-processor flow-downs trackedVendor master refreshed; renewal triggers in calendar; deduplication decisions ratified
    H, Material incident historyDisclosed-incident register reconciled to data room; undisclosed-signal review runCustomer and regulator notification posture documented; carrier letters reconciledYear-one R&W posture confirmed; renewal-ready evidence pack assembled

    The sequencing assumes the post-close playbook is run alongside this scorecard. The weakest section at day 21 dictates where days 1-30 spends its first dollar; the rest follows the standard 100-day cadence.

    What this is not

    This scorecard does not replace a SPA reps and warranties workup. The reps language is counsel's product; this scorecard is an input to it, not a substitute. It does not encode buyer-side regulatory overlay: the acquirer's own framework obligations, sector regulators, and customer commitments that carry through to the combined entity are scoped separately. It does not replace financial diligence, QofE, or commercial diligence; the cyber diligence report sits alongside those workstreams, not in place of them. It does not replace a cyber insurance application; the renewal questionnaire is structurally similar but has carrier-specific questions and underwriting attestations this scorecard does not encode.

    It is also frozen at the lastReviewed date, 2026-11-14.

    The diligence value compounds when the scorecard, the diligence report, and the post-close 100-day cadence are run together. The deal team partner who reads the Field Guide and runs the rubric themselves is doing it right. The deal team partner who hands it to the firm is buying a fixed-scope written report on a fixed timeline. That report is M&A technology diligence, scoped through our security and governance practice. Either path produces the deliverable. The deliverable is what survives the deal.