Skip to main content
    Securem Advisory
    Back to the paired field guide
    Prompt kitReviewed Nov 14, 2026

    AI Vendor Lock-In Prompt Kit

    Five reusable prompts to send during AI vendor scoping conversations to surface lock-in vectors before contract signature, covers BAA scope, exit data portability, model-version pinning, audit log access, and orchestration substitutability.

    Read the field guide

    When to use this kit

    This is a prompt kit to send to AI vendors at three moments: an active RFP where two or three vendors are still credible, late-stage diligence after a vendor has cleared technical scoring and the conversation has moved to legal and architecture, and the annual vendor review for an AI tool already in production. The kit surfaces the five lock-in vectors that hurt regulated buyers at exit, the moment when the firm wants to migrate, retire, or replace the vendor and discovers the cost is far higher than it expected.

    Use the prompts in writing. Send them by email to the vendor's solutions engineer with the legal counsel CC'd, or to the named account executive with a request to route them. Ask for written responses on the vendor's letterhead or in an email thread the buyer can attach to the diligence file. Do not accept verbal answers in a sales call as the record. A verbal answer in the demo can fail to match the contract language weeks later, and the buyer then has no written record to point to. Written responses also force the vendor's legal team into the conversation, which is what the buyer wants, the solutions engineer's answer is not the answer that ends up in the BAA addendum.

    The five prompts below cover BAA scope, exit data portability, model-version pinning, audit log access, and orchestration substitutability. Each prompt is followed by what answer is acceptable, what answer is not acceptable, and what answer is disqualifying for regulated-buyer scope. Each prompt also has a short follow-up line to send if the first response is vague. The paired guide, AI Adoption Playbook for Regulated Industries, scores vendors on five lock-in dimensions. Four of them are asked here: BAA scope, model versions, audit log access, and fine-tune portability, which sits inside Prompt 2. The fifth, data residency, is read from the contract, not asked. Prompt 5 adds orchestration, which the guide's list does not cover.

    Prompt 1: BAA / DPA scope completeness

    Please confirm in writing the full scope of the Business Associate Agreement (or Data Processing Agreement, as applicable) you would sign with us. Specifically: (a) which components of your platform are covered, model inference, orchestration / agent layer, vector store / retrieval, fine-tuning service, audit logging, and any observability or telemetry pipeline; (b) which subprocessors are covered under the same agreement and which require separate agreements; (c) whether the BAA covers only the production tenant or also non-production environments where regulated data may be processed during testing; and (d) whether the BAA flows down to any model provider you resell or front (e.g., third-party foundation models accessed through your platform).

    What an acceptable answer looks like. A single agreement (or a primary BAA plus an enumerated addendum) that covers the model, the orchestration layer, the vector store, the audit log, and the production and staging tenants. Subprocessors enumerated in writing with the BAA flow-down explicit. If the vendor fronts a third-party model, the vendor's BAA explicitly covers the inference call to that model.

    What is not acceptable. "We can sign a BAA on the model" without coverage of orchestration or the vector store, that creates a BAA chain the buyer has to manage themselves and is a common source of audit findings in regulated mid-market AI deployments. Also not acceptable: a BAA that covers production but excludes the staging environment, because regulated data shows up in staging during integration testing whether the firm intends it or not.

    Disqualifying. "We do not sign BAAs" or "we sign a BAA only on enterprise contracts above $250K ARR." For a regulated buyer, a vendor that cannot produce a BAA at the buyer's contract size is out of scope for any workflow that touches PHI, PCI, or restricted regulated data, the vendor may still be in scope for Architecture D workflows where regulated data never reaches the model.

    Follow-up if vague. "Please send the actual BAA template you would execute, redacted of pricing if needed, so our counsel can review the scope language directly."

    Prompt 2: Exit data portability

    Describe in writing the data we can export from your platform if we terminate the contract. Specifically: (a) the format and access method for prompt and completion logs across the full retention window; (b) whether embeddings we have generated and stored with you can be exported in a documented vector format; (c) for any fine-tuned or customized model adapters we have produced, whether the underlying training corpus, the adapter weights, and the evaluation set are exportable and in what format; (d) the retention window during which we can still pull our data after termination; and (e) the certifications you provide that our training data, embeddings, and fine-tunes have been deleted from your systems and any subprocessor systems following our termination instructions.

    What an acceptable answer looks like. Logs available via API or bulk export in JSON or NDJSON with documented schema. Embeddings exportable as vectors with the model name and dimensions documented, even if the model itself stays. Training corpora exportable in their original form (the buyer should already control these in their own storage, but vendors who hold copies should release them on request). Fine-tuned adapter weights are usually not portable, that is honest, but the answer should say so plainly rather than gesture at portability the vendor cannot deliver. Termination retention window of 30 to 90 days. Deletion certification provided in writing referencing specific subprocessors.

    What is not acceptable. "Logs are available through the dashboard" without an API or bulk export, a dashboard export is not a portability guarantee at audit scale. Embeddings claimed as portable in marketing but available only through screen scraping or paginated API calls with rate limits that make a full export take weeks. Deletion certification offered only as a statement on the termination email rather than a signed document.

    Disqualifying. "Embeddings cannot be exported" or "fine-tune training data is now part of our model and cannot be deleted." Both responses are red flags, the first means the buyer is rebuilding the embedding cost on every migration, and the second means the vendor has commingled the buyer's data with their own model in a way the buyer cannot extract from.

    Follow-up if vague. "Please send a documented runbook of the export process, the API endpoints, the formats, the time required, that a customer in our position has run in the last six months."

    Prompt 3: Model-version pinning and forced upgrades

    Describe your policy on model versioning for regulated customers. Specifically: (a) can we pin the contract to a specific model version (e.g., the model identifier we are evaluating today) for the contract term; (b) what is the minimum notice we receive before a model is deprecated, and is that notice a contractual commitment or a best-effort changelog item; (c) what is the migration path when a model is sunset, do you provide the prior version on a long-term-support tier, do you offer a managed cutover with parity testing, or does the customer take the migration risk; (d) for orchestration layers that select among multiple model versions, can we lock the routing to a single named version; and (e) when you upgrade your platform (orchestration, vector store, agent runtime) in ways that change behavior even with the same model pinned, what notice and rollback do we get.

    What an acceptable answer looks like. Model version can be pinned for the contract term, named in the order form or BAA addendum. Deprecation notice of at least 12 months for regulated tiers, written into the contract. Migration path includes a parity-testing window during which the prior and new versions run in parallel. Orchestration upgrades have a documented release-note channel and a rollback procedure that the customer can invoke. The vendor distinguishes clearly between a model upgrade (the foundation model behind the API) and a platform upgrade (the orchestration around it) and gives the customer notice and rollback on both.

    What is not acceptable. "We give 90 days' notice" with no contractual commitment, 90 days is not enough time for a regulated firm to re-validate a workflow against a new model, and a non-contractual commitment can shrink to 30 days when the vendor decides to. Also not acceptable: model pinning available only to the top enterprise tier with a custom contract that takes six months to negotiate, when the buyer is at the lower enterprise tier.

    Disqualifying. "Model versions are managed at our discretion and customers receive the latest version", the regulated buyer cannot deploy a workflow whose underlying model changes without notice, because the validation work the buyer has done on the prior version is invalidated.

    Follow-up if vague. "Please share your published deprecation history for the last 24 months and the actual notice period customers received for each deprecation, not the policy stated in the documentation."

    Prompt 4: Audit log access and durability

    Describe in writing how we access prompt-content and completion audit logs from your platform. Specifically: (a) the formats available (JSON, structured event, SIEM-friendly); (b) the access modes, dashboard, API, bulk export, SIEM integration (Splunk, Sentinel, Datadog, S3 push); (c) the retention window in your platform versus the retention window we can configure; (d) whether logs are immutable on your side or whether your operations staff (or ours) can delete log entries; (e) whether you log prompt content, completion content, model-version metadata, and tool-call traces, and what you do not log; and (f) the latency from prompt execution to log availability, and the SLA on log durability.

    What an acceptable answer looks like. JSON or NDJSON via API, with optional SIEM push (S3 push or direct connector). Retention configurable up to the buyer's policy maximum, typically seven years for regulated workflows. Logs are immutable on the vendor side; deletion requires a documented customer request with audit trail. Prompt content, completion, model version, and tool-call traces all logged. Latency from execution to log availability under five minutes. Durability SLA at the vendor's standard storage tier (typically 99.99% or better).

    What is not acceptable. Audit logs available only through a dashboard with no programmatic export, that is unauditable in practice. Retention capped below the buyer's policy maximum and not extensible. Tool calls or retrieval queries excluded from logging, that is the gap that lets a regulator's question about retrieval grounding go unanswered.

    Disqualifying. "We do not log prompt content" or "logs are deleted after 30 days and not configurable." For any workflow touching confidential or restricted data, logs are the audit evidence; without them, the workflow cannot ship.

    Follow-up if vague. "Please share a sample log record (synthetic, not real customer data) showing the schema and field set, and the API or SIEM integration documentation for pulling logs at scale."

    Prompt 5: Orchestration substitutability

    If we adopt your orchestration layer (e.g., your knowledge-base feature, your agent framework, your retrieval layer) and later need to migrate to a different vendor, describe what is portable and what is rebuilt from scratch. Specifically: (a) can prompts, system instructions, and configuration be exported in a documented format; (b) are tool definitions and function schemas exportable in a standard form (OpenAPI, JSON Schema) or in a vendor-proprietary form; (c) can the metadata layer (knowledge-base manifest, document chunking config, retrieval-tuning parameters) be exported; (d) for any agent definitions or workflow graphs, do you support an open standard or a documented export; and (e) what percentage of orchestration configuration in your platform is, in your honest assessment, vendor-proprietary versus portable.

    What an acceptable answer looks like. Prompts and system instructions are stored in the customer's own version control (the vendor encourages this rather than holding them) and pushed to the platform via API or IaC. Tool definitions follow OpenAPI or JSON Schema. Knowledge-base manifests exportable. Agent definitions follow a documented schema even if not yet a cross-vendor standard. The vendor gives a candid percentage estimate of portability, "roughly 60% of configuration is portable, 40% is vendor-specific" is more credible than "everything is portable."

    What is not acceptable. Prompts and configuration stored only in the vendor's UI with no export. Tool definitions in a proprietary DSL with no documented export to a standard format. Knowledge-base configuration treated as opaque. Agent graphs locked into a vendor visual editor.

    Disqualifying. "Configuration cannot be exported" or "we don't support migration tooling", that response means the buyer is committing to the vendor for the life of the workflow, which a regulated buyer should not do without an explicit write-off of the migration risk in the architecture decision.

    Follow-up if vague. "Please share the documentation for exporting orchestration configuration and a customer-shareable example of what an exported configuration looks like."

    Scoring the responses

    Each of the five prompts gets a score from whoever reviews the responses:

    • 0, vague, evasive, or non-responsive. The vendor talked around the question, deferred to "it depends on the contract," or did not put the answer in writing.
    • 1, answered, but with gaps. The vendor responded substantively but the answer surfaces a real lock-in risk that the buyer will need to mitigate or accept.
    • 2, answered concretely with documentation. The vendor put the answer in writing, referenced the actual contract or documentation, and the answer holds up to a counsel read.

    Sum across the five prompts, for a maximum of 10. A disqualifying answer on any prompt takes the vendor out of regulated-buyer scope whatever the total; the sum ranks the vendors that remain. A score of 8–10 is a vendor ready for regulated-buyer scope. A score of 6–7 is workable with negotiated mitigations in the contract. A score under 6 is a vendor not yet ready for regulated-buyer scope on workflows that touch confidential or restricted data, the vendor may still be appropriate for Architecture D workflows where regulated data never reaches the model.

    What to do with the responses

    Keep one record per vendor: the five scores, a one-paragraph note on the strongest lock-in vector, and what that means for the architecture: production-ready, pilot-only with named controls, or out of scope for the workflow under review. That record is the baseline for the annual vendor review.

    On a Diagnostic with the AI scope, the written report makes a build or buy call for each priority workflow, read against the lock-in position of the vendors the firm actually uses. Where vendor review is part of the agreed scope, the responses to this kit feed that call and the report's 90-day plan. The same read informs the platform choice when the next step is an AI transformation build.

    What this is not

    This kit is not contract language. The acceptable answers above are scoping signals; the actual contract language belongs to the buyer's counsel and the vendor's legal team to negotiate. Counsel must read the BAA, DPA, and order form on their own. The kit is also not a substitute for technical proof, a vendor can answer the prompts well and still fail an integration test. Run the proof-of-concept on the workflow that matters and validate the answers against the platform's actual behavior.

    The kit is also not a vendor disqualifier in itself. A vendor scoring 5 on the rubric is not unsuitable for every workflow; it is unsuitable for a regulated workflow at the firm's current architecture. A vendor scoring 9 is not automatically the right choice; capability, price, and fit still matter. The kit is a scoping aid that surfaces the lock-in conversation early enough, before contract signature, before integration work, before the buyer is committed, for the architecture decision to be made with the lock-in cost on the table rather than discovered at exit.